Several months ago, my father and I replaced one of the water heaters in my house. It was about 10 years old, making "clangy" noises, and from my assessment was on its way out. When we had originally looked at the project we thought it would take us about 3 hours from start to finish to replace it. Well, 6 hours later we were finally wrapping things up and it wasn't because we didn't know what we were doing either...there were just so many "gotchas" in the replacement process.
That night as I sat back and reflected on the whole ordeal I realized how similar this particular home improvement project can be to IT development projects. So, here are a few bullet points that elaborate on my analogy:
- Always plan ahead in your project. One of the reasons for the extra time in this project was that I had to make 3 different stops to the hardware store because I didn't plan ahead enough for the project.
- Hope for the best, but be prepared for the worst. Account for this in your project estimation. I hadn't put too much thought into the fact that the new water heater was 3 inches taller and 2 inches wider in diameter. This makes a big difference when all of the plumbing lines are sautered copper...they don't bend and they're not flexible. So, we hadn't built into our estimate the time it would take to redo all of the plumbing.
- Don't be suprised if there are "gotchas"...especially when it comes to your budget. I had no idea that the price of metals had gone up so drastically over the last few years. I spent an additional $100 in project materials...I had originally estimated this cost to be less than half that amount.
- When implementing your solution, think of the worst possible scenario, and account for it. Not only do I have a drain pan underneath the water heater, but I also have a drain line so if leaking starts to occur the water exits through the pvc lines (which we ran through the walls) and to the outside of the house. In addition, the new unit has a "smart sensor" system that would not only prevent an interior flood, but will also shut itself off completely (including the natural gas) if a problem is detected. I'm very confident now that I'll never have a problem in this department.
- When designing your solution, think scalability. The new plumbing lines are "flex" lines going from the actual hard-copper lines to the new water heater unit. This cost me a little more, but the next time I have to replace it, re-plumbing won't be necessary.
- If at all possible, don't go it alone. If you haven't lifted a fifty-gallon hot water heater lately, go to your local hardware store and try. They're quite heavy and an oblong shape. It was good that there were two of us for this reason, but also because we were continually double-checking each other. We had a good system of checks and balances in place.
- Read the fine print. The new unit came with the option to purchase a "lifetime warranty". Folks, water heaters don't last a lifetime, so this wording caught my eye. After reading the fine print though and calculating the cost, I realized their business genius. The total implementation cost would have been 3-4 times as much as I paid doing it myself. In addition, there are ongoing maintenance costs to ensure you comply with the fine print within the warranty. We've all heard it a thousand times, but if something sounds too good to be true, it probably is!
- Don't wait for a problem to occur...be proactive. This is often times easier said than done because the reality of it is that usally the squeaky wheel gets the grease. I didn't have to change the unit when I did, but I saved myself a potential mess and a lot of $$$ by doing it this way.
So, when planning your next development project, take into account the need to have a solid plan, have enough resources available, have adequate funding, set aside contingency dollars for the unexpected "gotchas", anticipate requirements scope creep, and think proactively.
Tuesday, October 28, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment